İFrancis Jones

A view of setting up well logging tools on the cat walk. One operator is on the drill rig floor setting up the sheaves, while the second operator is putting tools together into a stack of tools up to 30 m long. After the 7-conductor cable is attached, a winch on the logging truck will lift the whole string of tools up into the drilling rig, and then lower it into the bore hole.
Back To: [ Beginning ]